besides cost of lease, machines and the hourly wage what else is a cost?
things like insurance and 401k/pension plan what other costs are necessary at minimum to run a manufacturing building (less than 10 people)?
What permits and testing needs to be done?
things like insurance and 401k/pension plan what other costs are necessary at minimum to run a manufacturing building (less than 10 people)?
What permits and testing needs to be done?
Aucun commentaire:
Enregistrer un commentaire